Following installation of the foundations, the substation equipment is delivered and installed at the station. The equipment installed at the stations includes, but is not limited to, substation security fence, steel structures, circuit breakers, transformers, capacitor banks, and control buildings.

 

After the equipment is installed, a finish layer of crushed stone (typically 6 inches deep) is installed over the entire station up to the base of the structure foundations.


.