1 Haldia Dock Complex 

Development of Boulder Moorum Topped pavement between the two Railway lines at the backup area of Berth no. 6 (erstwhile berth no. 5), HDC, Haldia.

2 West Bengal Industrial Development Corporation Ltd.

Execution of works Related to Social Infrastructure project, Construction of Shifted Canal, Up-gradation of Infrastructural work, Road & Utility Cleaning of internal road, Entry from NH-60 and Shifted Canal  at Vidyasagar Industrial Park, Kharagpur.

3

CPF (India) Private Limited

Construction of Compound Wall, Fire Hydrain Water tank,  Truck Scale, Toilet Block, Under Ground Water Tank,  Internal Roads, Fire Hydrant Pipe under ground drain, Electrical work, Super PS Walkway, Under Ground Work, etc.

4

BRG GROUP (IEIPL, RVPL & BSPL)

Land development and others civil work, Earthen Soil filling & compacting work,  PEB S/U/T Building, Subway, Weight Bridge, Brick work and Plater, Sink presses foundation, High mast, Water complex, Construction of Drain, Sub-station, Store building, Process water tank with pump house, etc.

5

Tata Metaliks DI Pipes Limited

Construction of RCC Road, Civil Job during Shutdown, New Main Store Building

6

Tata Metaliks Limited

Construction of By pass Concrete Road, Bricks works

7

Accropoly Ninomiya Industries Pvt. Ltd

General civil work - Construction of Boundary wall, Tube well boring, Land filling

8

Toro Processors India (P) Ltd.

Land filling, Boundary wall, RCC and Paver block Roads and Admin building other building with Turnkey basis job

9

Ravikiran Cryogenic Gases Pvt. Ltd.

Construction of Boundary wall, Administration building and storage shed including connecting work and cylinder filling at Kharagpur

10

ACE Feeds Pvt. Ltd.

Land filling and construction of compound wall

 11

Nutrikraft India Private Ltd.

Construction of Boundary wall including plaster work at Kharagpur

12

Ramakrishna Mission Residential College

Structural and Sheeting work at Narendrapur, Kolkata

13

Haldia Dock Complex

Excavation and carriage of Dredged Spoils from within Earthen Dykes in the area to the West of Turning basin and near Oil Jetty area of Haldia Dock Complex for Land Filling.

14

Indian Oil Corporation Limited

Modification of Drainage system of ows & crws to stop overlow at FOB and FCCU in Haldia Refinery

15

Haldia Municipality

Construction of School Building new at Mahaprabhurchak, Township, Haldia

 

 

Corporate Office

Vill.+P.O-Chaitanyapur, P.S-Sutahata,

Haldia, Purba Medinipur-721 645

West Bengal, India,

Phone: 03224-287984,

Mob: 09732545357 

E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Register Office

Vill.+P.O-Dwariberia, P.S-Sutahata,

Haldia, Purba Medinipur-721 654

West Bengal, India,

Phone: 03224-287984,

Mob: 09732545357 

E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Quality Control